Following the selection of a suitable capture approach, BPP Tech can deliver more detailed Front-End Engineering Design (FEED) of the CCUS system.

CCUS FEED Services Include
- Development of process flow diagrams (PFDs).
- Selection of amine types and concentration.
- Specification of absorption column design and size.
- Specification of regeneration column design and size.
- Specification of heat exchanger design and size.
- Specification of reboilers design and size.
- Specification of the CO2 storage methodology, size requirements, and other process parameters.
- Design and optimisation of liquefaction system to meet storage requirements.
- Additionally, BPP Tech can perform a techno-economic assessment of the proposed design, including estimation of capital expenditure (CapEx) for system development and operational expenditure (OpEx) for long-term operation.